Interior site coordination cost in Romania: what to ask for in the offer

Site coordination for an interior design project is generally billed as a per square meter rate, hourly rate, percentage of investment or fixed package. A complete offer must explicitly indicate the number of visits, checks included and written deliverables, not just a final figure. The real difference between a good proposal and a minimal one is not the price, but what you're allowed to ask for back when things don't go as planned.
In summary:Site coordination is priced per square meter, per hour, as a percentage of the investment or as a fixed package, and the price depends on the level of detail and the number of visits included.It is essential to ask for a concrete example of a visit report to assess the rigorousness of the site tracking, not just a generic form.In the case of complex projects or with many subcontractors, the complete coordination package ensures the prevention of unexpected costs and the correctness of execution.Comparison of offers should take into account the exact number of visits, checks and technical deliverables, not just the price per square meter.At SelfDezign, the simplified process includes a reference visit and a customized quote, being recommended for interior design projects in areas such as HORECA, medical or office.
SelfDezign
Coordinate the fit-out without standard solutions
SelfDezign designs and coordinates HORECA, commercial, office and medical spaces, adapted to the real context and objectives of the project.
What site coordination includes for interior design projects
Site coordination means the supervision of the execution of the fit-out works, not the legal occupational safety compliance. The two roles are frequently confused, but an interior designer who coordinates the execution checks something other than an occupational safety and health coordinator: the first monitors whether the space is being built according to the technical project, the second monitors the risks of injury on the site.
In practice, the coordination service comprises several distinct types of visits. Some mark the acceptance of a stage (completion of the structure for walls, installation of building services before closing false ceilings), others check samples of materials directly on site, and still others are control visits scheduled to prevent slippages.

The role also includes the verification of compliance with the technical design: whether the execution teams comply with the positions of the sockets, the elevations of the fixed furniture or the finishing details in the drawings. An interior designer can include in the coordination the follow-up of orders, the checking of material deliveries and the supervision of custom furniture installation.
The concrete deliverables you should receive include:
- Written reports after each visit, with comments and remediation deadlines
- Dated photos of critical milestones, useful in discussions with subcontractors
- Punch lists with an owner and a due date for each point
- Written confirmation of conformity with the technical design at key phases
Professional advice: Ask from the beginning for a real example of a visit report. An empty paper form says nothing about how rigorously your site will be tracked.
How to calculate the cost: rate per sqm, hourly, percentage or fixed package
Each pricing method has its own logic, and the wrong choice leads to either unexpected costs or an inflated bill for services you didn't ask for.

Rate per square meter is most prevalent for medium-sized residential and commercial projects. Its simplicity is also its limit: in a space with complex installations (dense MEP, professional kitchen, multi-network medical office) or large volume custom-made furniture, the price per sqm quickly underestimates the actual coordination work, because it does not take into account how many technical decisions have to be made on the ground.
Hourly rate becomes more transparent exactly in the above situations, when the number of hours varies from week to week. The downside: without an estimated ceiling, the invoice can increase without the customer having a clear benchmark.
Fixed packages provide predictability, but it is worth checking carefully: an inexpensive package can exclude additional visits or project changes, turning into separate costs later.
The pricing models commonly found in the Romanian market combine these four variants. Be careful with published benchmarks: the range of 35 to 80 euros per square meter refers to the interior design fee, not to site coordination.
How much site coordination costs in Romania and how to read the figures in the offer
The published benchmarks show ranges between 35 and 80 euros per square meter for the interior design fee. For a project of 60 square meters, this means between 2,100 and 4,800 euros for design. Execution coordination can be added separately or may already be included in the package, and its cost depends on the level of detail and the number of site visits included.
As a calculation benchmark, take these two examples:
- For a space of 100 sqm, a design fee of €40/sqm means 4,000 euros, and at €70/sqm it reaches 7,000 euros. If the package does not include coordination, its cost is added separately.
- For a space of 300 sqm, where the complexity of the installations and the number of subcontractors increase, the difference between minimal and complete coordination comes mainly from the number of visits and additional checks.
Frequent additional costs arise from visits over the contracted number, project changes required along the way and supplier delays that require rescheduling. None of these situations are unusual, but all must be provided for in the offer, not discovered after signing.
What to ask for in the offer and contract to avoid hidden costs
Comparing offers only by the price per square meter is risky: a small figure can hide the absence of essential visits or complete technical documentation. Well-built contracts separate design, coordination and, where appropriate, site supervision, with distinct roles for each.
What deserves to appear explicitly in any serious offer:
- The exact number of site visits and what is checked at each one
- Approval procedure for changes and tariff applied to additional works
- Invoicing method (advance, phased instalments) and payment deadlines
- Final delivery documents (minutes, checklists, guarantees) and acceptance criteria
The complete technical documentation, with dimensioned drawings and bill of quantities, reduces execution errors and justifies a higher rate than a quotation that is limited to a visual concept.
Professional advice: Ask for a concrete example of the acceptance report, not just a generic description of the service. If the supplier cannot show a real model, it is a signal that the procedure is not yet formalized.
What real savings professional coordination brings
Coordination prevents expensive execution errors: wrongly positioned sockets, rebuilt tile joints, custom-made furniture incompatible with the installation routes. Each of these mistakes means disassembly, lost materials and days of delay.
Checks in the 3D design phase, by methods of detecting conflicts between technical routes and fixed furniture, prevent exactly these costly interventions before they appear on the site.
A meter of electrical installation displaced on paper costs a few minutes of drawing. The same meter discovered in the wrong place after the tiles are laid costs days of rework and an emergency budget that no project has planned for.
In the long run, the correct coordination also reduces maintenance costs, because the correctly documented technical routes make subsequent interventions faster and cheaper.
SelfDezign voice: when we recommend turnkey coordination
We recommend the complete coordination package when the project involves dense installations, custom-made furniture or more than two subcontractors on site at the same time. It is exactly the profile of HORECA projects, medical clinics and large offices, where an execution error not only costs money, but also lost operating time.
At SelfDezign we follow a clear flow: detailed brief, visit plan established from the start, checklists for each stage and careful synchronization of orders with the pace of the site. We do not sell the promise of a beautiful space, but the clarity of a process that protects the customer's investment from the first contact to the final reception.
We are interested in the contract that resists the reality of a site, not just a sales discussion.
How to get a SelfDezign quote for site coordination
SelfDezign is the alternative to a studio that offers only a visual concept without field tracking: we design and coordinate the execution, so that what you see in the plan corresponds to what is actually built. The process is simple: submit a brief with the type of space and area, a reference site visit follows, then you receive a customized offer with the number of visits, deliverables, and pricing model tailored to your project.
The SelfDezign offer for commercial, HORECA or medical projects includes the interior concept, the technical project and the coordination of the execution as distinct but correlated services. For an office that also needs to support team productivity, you can see our approach on the office interior design page.
Ask for an example estimate and a clear number of visits before signing any coordination contract.
Sources
For further verification, these resources detail the pricing ranges and roles discussed in the article:
- How much does an interior designer cost in Romania in 2026
- What an Interior Designer Does: How It Helps and How Much It Costs
For the preparation of the execution logistics, also consult the SelfDezign renovation planning guide, useful in the stage of synchronizing orders with the pace of the site.