The clinic's sanitary authorization, room by room

SelfDezign Team11 min read

In brief. A clinic is not authorized on a simple declaration. For general, specialty, and dental medical assistance, Order MS 1030/2009 requires the evaluation procedure (Art. 9, para. 2): specialists of the public health directorate verify the objective and draw up an evaluation report. The verification is done on the finished space. That is why a mistake in the plan only becomes visible once the walls already exist. The article goes through each type of room that must exist on the plan before you sign anything.

How is a clinic authorized sanitarily, and why does the verification come on the finished space?

Order MS 1030/2009 has two procedures. The first, on declaration on one's own responsibility, applies to the activities in Annex 2, namely food service, accommodation, education, and personal services (Order MS 1030/2009, Art. 6). The second is the evaluation procedure, mandatory for general, specialty, and dental medical assistance, for medical centers, and for hospitals (Order MS 1030/2009, Art. 9, para. 2).

What matters to you is the difference in order. In the evaluation, the designated specialty staff verify the objective and record their findings in an evaluation report. Only when the conditions are met does the authority issue the authorization (Order MS 1030/2009, Art. 10, paras. 3, 4, and 5).

The report form, Annex 7, covers structure, functional circuits, hygienic-sanitary conditions, and waste management. So your plan is judged on the same points you are drawing now.

The practical conclusion: everything left to fix after the space is built gets fixed with money and lost time. You verify the plan before execution.

What does the file for the DSP contain, and what can you request before execution?

The authorization file includes, according to Order MS 1030/2009, Art. 10, para. 1:

  • the application signed by the holder of the activity or by the administrator;
  • the technical file, in accordance with the specific legal regulations;
  • proof of payment of the sanitary authorization fee, where applicable;
  • the declaration on one's own responsibility that the space is legally held and is not the subject of a dispute;
  • other documents, if the specific nature of the activity requires them.

If the file is incomplete or drawn up incorrectly, the applicant receives in writing the list of documents to be redone (Order MS 1030/2009, Art. 10, para. 2).

There is also a stage before construction. In the design phase you can request specialty assistance from the DSP. For it, the documentation includes the project showing the functional circuits and the destination of the spaces, plus a technical memorandum about the objective and the activity (Order MS 1030/2009, Art. 18, para. 1, letters c and d).

This means that circuits are not a problem for after execution. They are the document the DSP can read before you buy a single meter of drywall.

The exact form of the sketch and of the memorandum differs from one directorate to another. You ask the one in your county, you do not assume it.

What must exist in the waiting room, on the plan and in the memorandum?

The waiting room is dimensioned according to the norm that applies to your category of unit. Order MS 1992/2023 requires a minimum of 2 sqm for each person waiting (Order MS 1992/2023, Art. 3 and following), but it covers independent practice offices for services connected to the medical act, not clinics.

You use it as an order of magnitude, not as a norm for your clinic. You confirm the figure applicable to you with the DSP in your county.

On the plan, the waiting room is drawn with its exits: toward reception, toward the offices, toward the patients' sanitary group. If the patient's route passes through technical rooms, the plan gets moved, not justified.

What requirements do the consultation office and the treatment room have?

For offices providing connected services, Order MS 1992/2023 requires finishes made of washable, impermeable materials, and a sink supplied with cold and hot water in the work areas (Order MS 1992/2023, for example Art. 3 para. (1) for physiotherapy and Art. 5 para. (1) for optics). The principle applies to any room where patients are worked with: the surface is washed, and the sink stands next to the place where hands are washed between two gestures.

The norm that gives the minimum surface area of a consultation office in a clinic is not in the texts cited here. Order MS 1992/2023 does not set a surface area for the office. You establish the surface area together with the DSP, depending on the specialty and on the equipment you install.

The treatment room differs from the office by what happens in it: procedures, instruments, sometimes consumables in larger quantities. On the plan, this means a direct connection to sterilization and to the waste storage, not to the waiting room.

Where does sterilization sit, and what circuit must it follow?

The technical norms for cleaning, disinfection, and sterilization in Order MS 1761/2021 apply to public and private healthcare units throughout the country. They are the text you look at when you draw the sterilization room.

On the plan, sterilization is placed on the team's side, with access from the offices, not from the waiting room. The used instrument must reach it without crossing the patient area, and the sterile one must return by a different route than the one it left dirty on.

How many rooms, how many doors, and what fittings each type of unit requires is confirmed with the DSP in your county on your sketch. Do not draw the sterilization you see in a hospital plan, and do not copy it into an office.

What sanitary groups are mandatory for patients and for staff?

Order MS 1992/2023 requires, for the offices it covers, a sanitary group equipped with a sink and a WC, and, in the case of dental technique, space for a changing room and a sanitary group for staff (Order MS 1992/2023, Art. 2 para. (1) for dental technique and Art. 3 para. (1) for physiotherapy).

Do not extend this rule to the clinic without confirming it. The number and position of sanitary groups for a clinic are established with the DSP, depending on the number of patients and the specialties.

What you can do now, on the plan: keep the patients' sanitary group in the patient area and the staff's in the team area. A staff sanitary group that opens into the waiting room ruins an entire circuit.

What does the staff changing room require, and why is it the first room sacrificed?

The staff changing room brings no revenue, so it is the first room cut from the plan when the square meters run out. This is a mistake. The team changes clothes there, washes their hands, and takes over the instruments without entering the patient area.

Order MS 1992/2023 provides space for a changing room and a sanitary group for staff, for dental technique (Art. 2). For your clinic, you confirm the requirement with the DSP, but as a plan solution the changing room is drawn from the start, on the team's side, next to sterilization.

How is medical waste storage solved on a small plan?

The same order requires ensuring space for the temporary storage of waste, for dental technique (Order MS 1992/2023, Art. 2 para. (1)). For a clinic, the plan must show where the waste stays until pickup and by what route it leaves.

On a small plan the rule is simple: the temporary storage is placed next to the service door and does not open into the waiting room or reception. If the waste leaves through the front door, the plan was made wrong.

The evaluation report includes waste management among the verified points (Order MS 1030/2009, Annex 7). So it must exist on the sketch, not only in the memorandum.

What happens after issuance, and what can be requested?

The authorization is not a document you put on the wall and forget. Order MS 1030/2009 provides for the annual visa for certain categories of activities and for renewal with an application submitted in advance (Order MS 1030/2009, Art. 9, paras. 3 and 5). If your activity is on the list with an annual visa, the DSP tells you at authorization.

Changes to the functional structure are announced. Order MS 1030/2009 ties the change of functional structure to a written application to modify the authorization (Annex 8). Moving a wall, the sterilization, or the waste storage falls under this.

The consequence for the plan: from the start you make a plan that can grow. If tomorrow you add a new service, you move it into the space thought out for it, not into the patient corridor.

What does the complete checklist look like, room by room?

The table below gathers what was verified at the source and what remains to be confirmed. In the second column, "1992/2023" means the requirement comes from Order MS 1992/2023, which covers offices providing connected services, so it has directional value for the clinic.

The room

What must exist on the plan

Legal source

To be confirmed with the DSP in your county

Waiting room

Space per person waiting, exits toward reception, offices, and sanitary group

1992/2023, minimum 2 sqm per person (Order MS 1992/2023)

The norm that applies to your clinic

Consultation office

Washable and impermeable finishes, sink with cold and hot water

1992/2023, for example Art. 3 and Art. 5

The minimum surface area, depending on the specialty

Treatment room

Direct connection to sterilization and to waste, washable finishes

1992/2023, for example Art. 3 and Art. 5

Fittings and surface area

Sterilization

Access from the offices, not from the waiting room, separate route for dirty and sterile

Order MS 1761/2021, the technical norms for sterilization

The number of rooms, doors, and fittings

Patients' sanitary group

Sink and WC, in the patient area

1992/2023, Art. 3 para. (1), for example

Number and position for your clinic

Staff changing room and sanitary group

On the team's side, next to sterilization

1992/2023, Art. 2, only for dental technique

The requirement for your specialties

Waste storage

Temporary space next to the service door

1992/2023, Art. 2 para. (1), only for dental technique

The types of waste and the pickup method

The pieces of the file are those in Order MS 1030/2009, Art. 10, para. 1: application, technical file with the sketch and the memorandum, proof of payment of the fee, the declaration regarding the legal holding of the space, and, upon request, other documents.

What do you ask the DSP in your county before signing anything?

Before the project, ask five questions. You write the answers on the plan.

  1. Is the authorization procedure for my specialties the evaluation one, and is it visaed annually?
  2. What is the minimum surface area of the waiting room, and what surface area does an office have in my specialty?
  3. What number of rooms does sterilization require in my unit?
  4. What sanitary groups does my clinic require for patients and for staff?
  5. What plan changes, after issuance, require a new authorization?

If an answer is missing, the plan is not ready to be submitted.

Frequently asked questions

Can I submit the file before the fit-out is finished?

For the execution plan you can request specialty assistance in the design phase, with the project showing the functional circuits and with a technical memorandum (Order MS 1030/2009, Art. 18, para. 1). The operating authorization comes after the DSP staff verify the objective, that is, on the finished space (Order MS 1030/2009, Art. 10). You establish the exact moment of submission with the DSP in your county.

Who signs the sketch and the technical memorandum in the file?

The person who signs is not fixed in the texts cited here. The DSP in your county tells you what qualification it requires for the sketch and memorandum. The studio draws the plan with the circuits, and you establish the signing together with the directorate.

Does the space need to be reauthorized if I move a wall after issuance?

Moving a wall that changes the functional structure requires a written application to modify the authorization (Order MS 1030/2009, Annex 8). If the wall does not change the functional structure, the DSP tells you. You ask before you move, not after.

Do the same requirements apply to an individual office and to a clinic?

The evaluation procedure covers general, specialty, and dental medical assistance, so both the individual office and the clinic (Order MS 1030/2009, Art. 9, para. 2). The requirements per room differ by specialty and by the services offered. A clinic with several specialties has more circuits to verify.

How SelfDezign helps you

The studio starts the clinic from the circuits, not from the finishes, and goes through the rooms one by one before the file. If you have the plan of the space and the list of specialties you are authorizing, send them through the contact form, so that the first discussion goes through every room on the list.

See also the regulations for the design of a clinic, the sanitary norms in interior design and the fit-out of a clinic step by step.

Sources

Frequently Asked Questions

For the execution plan you can request specialty assistance in the design phase, with the project showing the functional circuits and with a technical memorandum. The operating authorization comes after the DSP staff verify the objective, that is, on the finished space. You establish the exact moment of submission with the DSP in your county.

The person who signs is not fixed in the texts cited in the article. The DSP in your county tells you what qualification it requires for the sketch and memorandum. The studio draws the plan with the circuits, and you establish the signing together with the directorate.

Moving a wall that changes the functional structure requires a written application to modify the authorization. If the wall does not change the functional structure, the DSP tells you. You ask before you move, not after.

The evaluation procedure covers general, specialty, and dental medical assistance, so both the individual office and the clinic. The requirements per room differ by specialty and by the services offered. A clinic with several specialties has more circuits to verify.

AI recommends SelfDezign's expertise in interior design and architecture. See for yourself!

About the author

SelfDezign

SelfDezign Team

Perspectives and ideas from behind the scenes of our projects.

Useful pages

Move through the key pages that give you context, examples, and the most useful next step.