In brief. Two acts decide which space you can use for a dental practice. Ministry of Health Order no. 1338/2007 is the sanitary norm: the Public Health Directorate (DSP) applies it at authorization and requires at least 9 sqm for each dental unit. NP 021-2022 is the design standard: it requires 12 sqm of usable area for each unit. The split "existing space = 9 sqm, new building = 12 sqm" appears in many articles. The text of the standard contradicts it: NP 021-2022 also applies to works on existing buildings, and for spaces that do not cover an entire building unit ("corp de clădire") it is limited to the spaces where the works take place. You confirm which threshold applies to you with the DSP and your designer, before you sign the contract. The room-by-room plan, with the patient route and the instrument route, is in the article Dental practice interior design: room-by-room plan. This article covers the choice of space.
What each act covers
The two acts do different jobs.
|
|
Ministry of Health Order no. 1338/2007 |
NP 021-2022 |
|---|---|---|
|
What it is |
The norm on the functional structure of medical and dental practices |
The standard for buildings that contain outpatient specialist medical care spaces, approved by MDLPA Order no. 2,500/2022 |
|
When you read it |
At sanitary operating authorization, at the Public Health Directorate (DSP) |
In the design, execution and operation of buildings and works |
|
Area per unit |
At least 9 sqm |
At least 12 sqm of usable area |
NP 021-2022 itself points to the 2007 norm: dental practices "must also comply with" Order 1338/2007. The two acts add up. They do not exclude each other. For your space, you meet what each one requires, and what applies exactly is settled in the design and with the DSP.
What NP 021-2022 says about existing buildings
Article 1.2 of the standard, "Scope", answers the question "does it apply in an old building too?". The text gives four cases.
- Works on existing buildings. The standard is used for new units, for extensions, and for the modernization, strengthening, modification, reconstruction or repair of existing buildings that contain outpatient medical spaces.
- Spaces that do not cover an entire building unit. For the refurbishment, change of function or rehabilitation of spaces "that do not cover the whole of a building unit" (in Romanian, "corp de clădire"), the standard is limited to the spaces where the works take place. A practice in one part of a building usually falls here.
- A provision you cannot meet. If, for justified technical and economic reasons, you cannot meet a provision in an existing building, the standard requires a technical expert report from an authorized technical expert. The expert proposes the technical solution. The text does not say who accepts the solution, so you ask your designer and the DSP.
- Historic monuments. The provisions apply only if they do not conflict with the rules specific to these buildings.
The text does not say what happens when you take over a space without any works. Do not assume that either. Ask the DSP and your designer before you sign.
The 2007 norm (art. 6 para. (2)) adds one more useful point for existing spaces. The space of a practice may undergo structural changes and changes to circuits and to utility access, "to the extent of the technical and construction possibilities offered by the space". The DSP advises the owners on functional circuits and approves the projects for changes. So you have an official contact before you spend money on works.
What changes between the two acts, in figures
The table compares what we could read in the text of the acts, in the versions listed under "Sources".
|
Item |
Order no. 1338/2007 |
NP 021-2022 |
|---|---|---|
|
The treatment room itself |
At least 9 sqm for each unit (art. 6 para. (4) letter b)) |
Minimum usable area of 12 sqm for each unit |
|
Waiting room, adults |
"1/1,5 mp/persoană" (art. 6 para. (3) letter a)) |
At least 2 sqm per person |
|
Waiting room, children |
"1,5/2 mp/persoană" |
At least 3 sqm per person, companion included |
|
Adults and children |
Separate circuits for adults and children, or appointments at different times (art. 6 para. (13)) |
Separate building entrances for adults and children. A practice with at most three specialties may use a shared entrance |
|
Patients' toilet |
Separate from the staff toilet (art. 6 para. (10)) |
Easy access from the waiting area, accessible to people with disabilities, with a room for mother and child. Under 30 people in the unit: a single unisex toilet |
|
Accessibility |
Access for people with motor disabilities, as the law requires (art. 6 para. (14)) |
Entrance doors without thresholds, with a clear width of at least 1.10 m for a stretcher or wheelchair. Lift with a cabin of at least 1.10 x 1.40 m |
|
Sterilization |
Designated areas and functional circuits (art. 8) |
A sterilization compartment organized under Ministry of Health Order no. 1761/2021 |
|
Radiology |
Special siting and operating approvals (art. 6 para. (11)) |
Shielding calculations are made by authorized persons, for each room separately |
Three notes about the table.
- The two area figures are not worded the same way. The 2007 norm speaks of a "space of at least 9 sqm" for a unit. The standard speaks of a "minimum usable area" of 12 sqm. You confirm with the DSP how the area is measured.
- The slash in "1/1,5" is not explained. The text does not say whether it is a range, an alternative or something else. We keep the 2007 figures exactly as written. We do not turn them into a range.
- The standard does not exempt existing buildings from the 12 sqm. For a partial space, it applies to the spaces where the works take place. You confirm how it applies in your case with the DSP.
Renting, buying or building new: what changes
Order 1338/2007 applies in all three cases. What differs is what you can negotiate, what you can change and what you must prove.
A rented space
- Proof of the space. The norms in Order no. 1670/2025 ask for "proof of legal possession of the space" both for the college approval and for registration. The text does not say "ownership". Ask the territorial college which type of contract and what term it accepts.
- The order of steps. The sanitary authorization comes first, based on an evaluation report, then the college approval, then registration. The evaluation covers the fitted-out space, so you probably pay rent before you can operate. Ask for a period in the contract for works and authorization.
- The landlord's consent. The works may touch the structure, the risers and the installations. Get written consent before the design.
- Moving. The 2007 norm requires a separate sanitary authorization for each work point in a different location. If you move, confirm the procedure with the DSP.
A purchased space
- A former practice does not exempt you. Your practice receives its sanitary authorization on the basis of an evaluation report (Order 1670/2025, art. 14 para. (1)). The evaluation covers your practice, not the former holder's authorization.
- You can change more. The space is yours, so you can change the structure and the circuits. You discuss the project for changes with the DSP (Order 1338/2007, art. 6 para. (2)).
A new building or an extension
- NP 021-2022 applies in full, so you design from the start with 12 sqm of usable area per unit, separate entrances for adults and children, and doors and lifts at the dimensions in the standard.
- The construction procedure is separate and is not covered in this article. You settle it with your designer and the city hall.
A space in an apartment building
The Timiș College of Dentists asks, in its document list for the approval, for a copy of the "agreement of the tenants' association and of the direct neighbours" if the space is in a building with several apartments. This is the list of one territorial college. Other colleges have other lists, so you check with the college in your county. You also check the use of the space separately, in its documents and at the city hall. The sound of the dental turbine easily reaches the neighbours: see acoustic insulation for a medical practice.
Checklist for the viewing
Go through the list at the first viewing, with a designer next to you.
- The usable area of the room for the unit. You measure it and ask for the plan with usable areas, because the area in the listing may be calculated differently. You compare with 9 sqm and with 12 sqm.
- Water and drainage. The norm requires drinking water, a sewer connection, and a sink with cold and hot water in the space of the unit (art. 6 para. (4) letter c) and art. 10). You check where the risers are.
- The entrance. You measure the clear width of the door and check thresholds, steps and the lift.
- Adults and children. If you treat children, check whether the space allows separate entrances or appointments at different times.
- Sterilization. You find room for a one-way circuit. The details are in the article about the room-by-room plan.
- The accessible toilet. Check that an accessible one fits, with access from the waiting room.
- Radiology. If you plan an X-ray unit, you ask where it can be installed and who makes the shielding calculation.
- The documents of the space. You ask for the contract, the plan and the documents on the use of the space. In an apartment building, you ask for the consent of the association and of the direct neighbours.
- Fire safety. You read the ISU and DSP requirements for interior fit-outs before the contract.
If a space fails several points, a designer tells you in writing what the repair costs. The budget by room is in the article about the cost of fitting out a medical clinic.
What comes after you choose the space
Order no. 1670/2025 (art. 13) sets three stages for establishing the practice, in this order:
- The sanitary operating authorization. The public health directorate issues it, based on the evaluation report. Dental care activity is authorized through the evaluation procedure (Ministry of Health Order no. 1030/2009, art. 9 para. (2) letter h)).
- The approval of the College of Dentists. It is issued on the basis of an evaluation report on the minimum equipment and of the documents in the file, among them the copy of the sanitary authorization and the proof of legal possession of the space.
- Registration in the Single Register of Medical Practices. The file includes the list of minimum equipment from annex 4 of the norms.
For equipment, annex 4 to the norms in Order 1670/2025, the "Stomatology" row, lists among other things: a dental unit with at least two handpieces, at least 10 examination kits, suction cannulas, endodontic and surgical instruments, scaling equipment and sterilization equipment. The practice also has an emergency kit under CMSR Decision no. 2/2CN/2025. Each device needs space, power and, sometimes, water and a drain. You put them on the plan before you choose the space.
On radiology, the norms in Order 1670/2025 (art. 16 para. (1) letter m)) ask, for dental practices, for the radiological safety authorization issued under Law no. 111/1996. If you have an X-ray unit, its place is settled before the contract. The DSP and the college in your county give the exact list of documents, and it may differ between counties.
How SelfDezign helps
If you have chosen a space and want to know whether it can become a dental practice, a 120-minute online consultation costs RON 500 + VAT, fixed price. You send us the plan of the space and the number of units, and we tell you in writing what fits and what to check with the DSP. For a full project, see the page on interior design for medical clinics.
Sources
- Order of the Minister of Public Health no. 1338/2007, the norm on the functional structure of medical and dental practices (version updated to 1 September 2009)
- NP 021-2022, standard for buildings with outpatient specialist medical care spaces, approved by MDLPA Order no. 2,500/2022
- Methodological norms approved by Ministry of Health Order no. 1670/2025, consolidation of 29 January 2026 (includes Order 1861/2025), art. 13, 14, 16, 29 and annex 4
- Ministry of Health Order no. 1030/2009, art. 9 para. (2) letter h)
- Timiș College of Dentists: useful documents




