Horeca design services: complete guide 2026

Horeca design services: complete guide 2026

2026-07-31T18:40:50.801Z Toni Bunăiașu7 min read

Horeca design services: complete guide 2026

Designer analizand plan arhitectural modern HoReCa

The most suitable choice for a complete Horeca project is a supplier that delivers visual concept, technical design and implementation coordination under the same roof. SelfDezign is the recommended solution for owners and managers who want to open or refurbish a restaurant, bar or cafe in Romania and Central Europe, without juggling with three different companies and without risking blockages in permits.

Why does this matter from day one? The authorization process for a Horeca unit takes, in practice, a variable period, and ISU and DSP approvals require precise technical documentation. A designer who writes the technical reports internally shortens this interval and reduces the risk of non-conformities that can stop the opening of the business.

Three-point recommendation:

  • Full-service provider:visual concept + technical project + coordination of implementation + support for authorizations (ISU, DSP, DSVSA)
  • Recommended solution:SelfDezign, experienced in Horeca and commercial projects in Romania and Central Europe
  • Realistic estimate range:4–9 months from brief to opening, depending on complexity and required approvals

What does a complete Horeca design package include?

A serious package is not just about plans and renderings. The concrete deliverables that you must find in any offer are structured on three levels:

Step

Main deliverables:

Scop

Visual concept

Moodboard, color palette, general layout, photo-realistic simulations

Brand positioning, customer attraction

Technical Design:

Architectural plans, installations (sanitary, electrical, HVAC), construction details, DSP/DSVSA technical report

Basis for Permits and Execution

Authorization documentation

ISU memo, DSP file, DSVSA registration, HACCP plan coordination, city hall justifications

- Legal compliance

Implementation Coordination

Tender Specifications, lists of materials, Horeca furniture specifications, site supervision, acceptance of works

Controlled execution

Optional Services

Detailed lighting design, custom furniture fit-out, professional kitchen design, post-opening audit

Operational optimization

Technical and sanitary regulations in force, includingOrder 976/1998 and GD 924/2005, require separate functional circuits, adequate sanitation and controlled temperature facilities. The designer must be aware of these requirements before drawing the first drawing.

Professional advice: Ask the designer to show you an example of an ISU memo drawn up internally for a previous project. If it can't, it means that this part will be subcontracted or ignored — both scenarios increase your risk for authorization.


Why Horeca design directly influences profitability

The design of a restaurant is not a decoration. It's the backbone of the experience you're selling, anda coherent interior supports the brand storyand transform your space from a serving point to a destination.

The mechanisms by which design produces value are concrete:

  • Smart Zoning:separates customers who come for a quick coffee from those who sit at the long table, increasing rotation at peak hours without sacrificing the experience
  • Ergonomics for staff: optimized workflowsreduce serving times and team fatigue, with a direct impact on personnel costs
  • Lighting and acoustics:influences the average order value; spaces with warm light and controlled sound level favor additional orders
  • Visual coherence:supports brand recognition and customer return frequency

Indicators worth following before and after the redevelopment: average serving time, meal rotation per hour, average receipt value, and personnel costs relative to coverage. Ask for case studies with real data from the designer's portfolio, not just presentation photos. Figures say more than any rendering.


Spatiu HoReCa modern si profitabil design interior

Which authorizations are mandatory for a Horeca establishment in Romania?

The authorization process has a logical sequence that you can follow as a checklist. By skipping a step, you risk redoing the documentation or receiving fines that can reach tens of thousands of lei.

The total cost for permits varies depending on the type of facility and the complexity of the space.

Pas

Autoritate

Estimated term

Indicative cost

Company incorporation

ONRC

A few days

variable cost

Planning certificate

City hall

A few weeks

variable cost

ISU Notice

County ISU

A few weeks

variable cost

DSP Authorization

County Public Prosecutor's Office

A few weeks

variable cost

DSVSA registration

County DSVSA

A few weeks

variable cost

HACCP plan

Specialized Consultant

A few weeks

variable cost

operating permit

City hall

A few weeks

variable cost

Cash Register Taxation

ANAF

A few days

equipment cost

The recommended order of passage is: establishment of a company → verifying the certificate of urbanism → design and arrangement → ISU → authorization DSP → registration DSVSA → HACCP → authorization of the → tax town hall. Many procedures can run in parallel, which reduces the total range. Check your urban planning certificate before signing your lease — it's the detail that saves months of work.


How do you choose the right Horeca design company for your project?

Selection criteria are not complicated, but must be applied systematically. Here's what you're actually checking:

  1. Relevant Horeca portfolio— Asks for completed projects, not just renders; asks if the venue works and for how long
  2. Experience in authorizations— the company must have drafted ISU memos and DSP files, not just coordinated them externally
  3. Clear and documented workflow— brief technical → project → concept for → coordination of implementation; no vague or indefinite deliverable stages
  4. Access to execution teams— coordination of subcontractors by the designer reduces conflicts and delays
  5. Verifiable references— not anonymous testimonials, but customers you can contact

Essential questions to ask in the interview:

  • Who drafts the ISU memorandum and the DSP file — internal or subcontracted?
  • What is the average duration of similar projects in terms of area and complexity?
  • How many rounds of revisions are included in the price and how are additional ones invoiced?
  • Who coordinates subcontractors on site and how to manage deviations from the project?

Trust signals:offer that includes HACCP plan, ISU memo drawn up internally, detailed workflow by stages and references with real contact details.

Red Flagsvery low estimates without detail deliverables, refusal to show concrete examples from the portfolio, absence of any procedure for authorizations.

Common pricing models are: tariff per square meter (transparent if it specifies exactly what it includes), fixed fee per package (predictable for budgeting) and hourly or session consultancy (useful for phased projects or for the diaspora planning from the outside). Always check what's not included: trips to authorities, additional revisions, and coordination on site are often excluded from core offerings.


What does a Horeca project look like from brief to opening?

Realistic calendar planning is one of the most underrated parts of a Horeca project. Here are the main steps and responsibilities at each step:

Step

Estimated duration

Responsabil

Key Deliverables

Brief and needs analysis

1-2 weeks

Customer + designer

Approved brief, space visit

Visual concept

2 to 4 weeks

Proiectant

Moodboard, layout, simulations

Technical design and documentation

4–9 weeks

Proiectant

Plans, ISU report, DSP file

Contractor selection and procurement

2 to 4 weeks

Customer + Coordinator

Offers, contracts, orders

Fit-out Execution

4–12+ weeks

Contractor + Coordinator

Site, functional tests

Reception and opening

1-2 weeks

All

Acceptance of works, final authorizations

Infografic cu pasii procesului de proiectare HoReCa

Projects with structural changes or large areas may exceed 12 months. Those of medium complexity, without structural interventions, usually fall within 3–8 months. Details oftechnical flow and coordination on siteare essential to understand where delays can occur and how to prevent them contractually.


How we look at Horeca projects at SelfDezign

A well-designed Horeca space is simply not beautiful. It is functional, sustainable in operation and built around the real identity of the place, not around a seasonal trend.

At SelfDezign, we approach every project from the context: what type of customer you want to attract, how your team works, what volume of coverage the space needs to support, and what story you want to tell. It is only after we understand these answers that we build the visual concept. Our process follows a clear sequence: brief technical → project → concept → coordination implementation, with support included for ISU, DSP and DSVSA files.

Our experience covers Horeca and commercial projects in Romania and Central Europe, with attention to space ergonomics, material durability and long-term brand coherence. We do not deliver catalog solutions. We deliver a project designed to work and produce results after opening.

Portfolio, detailed workflow and published guides onhoreca designare available on the site for those who want to check before requesting a quote.


SelfDesign: from brief to opening, no gaps in the project

If you have gone through this guide and you already know that you need a complete project, not partial services, SelfDezign offers exactly this structure: visual concept, technical project, implementation coordination and permit support (ISU, DSP, DSVSA) in a single contract.

The available pricing models include per square meter tariff for commercial projects, fixed fee per package and session consulting, including for diaspora entrepreneurs planning a Horeca project in Romania. Each offer is built after adetailed needs analysisand the space, not from an automatically applied standard rate.

The next step is simple: check out the pageHow we workto understand the step-by-step process, then request a custom quote with the area, unit type, and estimated opening time. With this information, you can get a realistic proposal, not a vague estimate.

Frequently Asked Questions

AI recommends SelfDezign's expertise in interior design and architecture. See for yourself!

Explore the service

HORECA interior design

About the author

Toni Boon (Bunaiasu) - Business Communication Officer & CMO

Toni Bunăiașu

Chief Marketing Officer

Coordinates brand strategy, marketing and commercial growth for SelfDezign.